> #materials , #estimation , #construction > Explain categories of wastage in materials in estimation?
m
mark okoth
Jul 25

Explain categories of wastage in materials in estimation?

1 view
1 view

2 answers

Sort By
C
ChatGPT
Jul 25
There are several categories of wastage in materials that need to be considered when estimating the quantity of materials needed for a project. These categories include:

1. Cutting and trimming wastage: This type of wastage occurs when materials such as lumber, tiles, or fabric need to be cut or trimmed to fit a specific size or shape. Some amount of material is inevitably lost during this process, so it is important to account for this wastage when estimating the quantity of materials needed.

2. Spillage and breakage wastage: Spillage and breakage can occur during the handling and transportation of materials, leading to a loss of material. This type of wastage is common with materials such as liquids, powders, and fragile items, and should be factored into the estimation of material quantities.

3. Overestimation wastage: Sometimes, estimators may overestimate the quantity of materials needed for a project, leading to wastage of unused materials. This can happen due to inaccurate measurements, incorrect assumptions, or changes in project requirements. It is important to carefully review and adjust estimates to minimize overestimation wastage.

4. Storage and handling wastage: Improper storage and handling of materials can lead to wastage due to damage, deterioration, or theft. It is important to consider these factors when estimating material quantities and to take appropriate measures to protect materials from wastage during storage and handling.

By considering these categories of wastage in materials, estimators can more accurately calculate the quantity of materials needed for a project and minimize unnecessary costs and waste.
0
G
Google Gemini AI
Jul 25
Categories of Wastage in Material Estimation

1. Cutting Wastage:

- Occurs when materials are cut to specific shapes or sizes, resulting in unused or leftover pieces.
- Types:
- Initial cutting wastage: Material lost during the first cut of the stock.
- Excess cutting wastage: Additional material lost due to overcutting or variances in cutting accuracy.

2. Shaping Wastage:

- Occurs when materials are shaped or processed into a specific form, such as bending, drilling, or punching.
- Types:
- Bending wastage: Material lost during the bending process.
- Drilling wastage: Material removed during the drilling operation.
- Punching wastage: Material expelled from the punch during hole creation.

3. Yield Loss:

- Occurs when materials are not of the desired quality or specifications, resulting in unusable portions.
- Types:
- Defective material: Material with physical or chemical imperfections.
- Breakage or damage: Material that is damaged during handling, storage, or processing.
- Scrap: Material that cannot be used due to excessive defects or contamination.

4. Storage Wastage:

- Occurs due to improper storage conditions, such as exposure to moisture, temperature fluctuations, or damage from handling.
- Types:
- Rusting and corrosion: Material deterioration due to moisture or air exposure.
- Breakage or damage: Material damaged during loading, unloading, or storage.
- Spoilage: Material degradation due to inappropriate environmental conditions.

5. Handling Loss:

- Occurs during handling and transportation of materials, resulting in loss or damage.
- Types:
- Losses during handling: Material dropped, spilled, or misplaced during handling.
- Transportation losses: Material damaged or lost during transit.

6. Expiry Loss:

- Occurs when materials expire or become unusable due to a limited shelf life or degradation over time.
- Types:
- Perishable goods: Materials that deteriorate quickly, such as food or chemicals.
- Non-perishable goods: Materials that have a longer shelf life but still experience some degradation.
0

Similar Questions

×
Anonymous





© 2024 - Quanswer