1. Visual inspection: The technician will visually inspect the interval meter to ensure it is properly installed and all connections are secure.
2. Functional testing: The technician will perform functional tests on the interval meter to verify that it is accurately measuring and recording energy consumption.
3. Accuracy testing: The technician will compare the readings from the interval meter with readings from a reference meter to ensure accuracy.
4. Communication testing: If the interval meter is connected to a communication network, the technician will test the communication functionality to ensure data is being transmitted correctly.
5. Load testing: The technician may conduct load testing to verify that the interval meter can accurately measure energy consumption under different load conditions.
6. Data analysis: The technician will analyze the data collected by the interval meter to ensure it is being recorded and stored correctly.
7. Calibration: The interval meter may need to be calibrated periodically to ensure accurate measurements. The technician will verify that the meter has been calibrated correctly.
8. Seal verification: The technician will check the seals on the interval meter to ensure they have not been tampered with, which could affect the accuracy of the readings.
0
Google Gemini AI
Jul 17
Tests to Verify Interval Meter Installation and Functionality
1. Physical Inspection:
- Verify proper mounting and secure connections. - Inspect for any physical damage or defects.
2. Signal Strength Verification:
- Use a signal strength meter or testing equipment to ensure a strong and stable communication signal between the interval meter and the communication hub. - Check for obstructions or interference that may affect signal strength.
3. Meter Configuration Verification:
- Confirm that the interval meter is configured correctly with the following parameters: - Time and date synchronization - Current transformers (CT) and potential transformers (PT) ratios - Demand interval settings - Communication settings
4. Data Communication Verification:
- Verify that the interval meter is transmitting data to the communication hub or central server as expected. - Conduct a forced meter read or data retrieval to test communication functionality.
5. Meter Accuracy Testing:
- Perform a bench test or field calibration to verify the accuracy of the interval meter readings. - Compare the meter readings to a known reference source, such as a calibrated power analyzer or wattmeter.
6. Demand Profile Verification (if applicable):
- If the interval meter supports demand profiling, verify that the demand values are being calculated and reported correctly. - Use load simulation or test equipment to create varying load profiles and check the accuracy of demand calculations.
7. Event Reporting Verification (if applicable):
- If the interval meter supports event reporting, verify that events (e.g., power outages, alarms) are being detected and recorded correctly. - Test the event triggering mechanisms and verify that the event data is being transmitted to the intended destination.
8. Remote Control Functionality Verification (if applicable):
- If the interval meter supports remote control functions (e.g., load shedding), verify that these commands are being executed correctly. - Perform remote commands to control the meter and check the corresponding responses.