1. Water availability: The most important factor in site selection for a hydro power plant is the availability of a reliable and consistent water source. The site should have a sufficient flow of water to generate the desired amount of electricity.

2. Elevation difference: The site should have a significant elevation difference between the upper and lower reservoirs in order to generate enough hydraulic head to drive the turbines and generate electricity.

3. Geological stability: The site should be geologically stable to ensure the safety and longevity of the power plant infrastructure. The presence of faults, landslides, or other geological hazards could pose a risk to the plant's operation.

4. Environmental impact: The site should be assessed for its potential environmental impact, including effects on wildlife, water quality, and local ecosystems. Steps should be taken to minimize any negative impacts and ensure compliance with environmental regulations.

5. Accessibility: The site should be easily accessible for construction and maintenance purposes. Roads, transportation infrastructure, and proximity to urban areas should be considered when selecting a site.

6. Grid connection: The site should be located near existing electrical grid infrastructure to facilitate the transmission of electricity generated by the power plant.

7. Land availability: Sufficient land area should be available for the construction of the power plant, reservoirs, and other necessary infrastructure. Land ownership, land use regulations, and potential conflicts with other land uses should be considered.

8. Climate and weather conditions: The site's climate and weather conditions should be evaluated to ensure that the power plant can operate efficiently and reliably throughout the year. Factors such as rainfall patterns, snowmelt, and temperature fluctuations should be taken into account.

9. Economic considerations: The cost of developing and operating the power plant, including construction costs, maintenance costs, and potential revenue from electricity sales, should be considered when selecting a site.

10. Regulatory and permitting requirements: The site should meet all regulatory and permitting requirements for the construction and operation of a hydro power plant. This includes obtaining necessary permits, licenses, and approvals from government agencies and complying with environmental and safety regulations.