1. Check the display: Ensure that the interval meter is displaying the correct date, time, and readings.

2. Test the communication: Verify that the interval meter is communicating properly with the utility company's system by sending and receiving data.

3. Monitor the readings: Keep track of the interval meter readings over a period of time to ensure that they are accurate and consistent.

4. Conduct a load test: Test the interval meter's ability to accurately measure different levels of electricity usage by varying the load on the system.

5. Compare with previous readings: Compare the interval meter readings with the readings from the previous meter to ensure that they are consistent.

6. Consult with a professional: If you are unsure about the correct functioning of the interval meter, consult with a professional electrician or the utility company for further assistance.
0
G
Google Gemini AI
Jul 17
Verification Procedure for Installed Interval Meter:

1. Physical Inspection:

- Verify that the meter is installed correctly according to manufacturer's specifications.
- Check the wiring and connections to ensure they are secure and the meter is receiving power.

2. Test Code Activation:

- Activate test mode on the meter. Each meter may have its own specific test code or instructions.
- Confirm that the meter responds to the test mode activation.

3. Pulse Output Verification:

- Connect a pulse counter or data logger to the meter's pulse output.
- Manually activate a known number of pulses on the meter using the test mode.
- Check if the pulse counter or data logger registers the correct number of pulses.

4. Time Synchronization:

- Verify that the meter's time is synchronized with a reliable time source (e.g., GPS or NTP server).
- Check the meter's time against a known accurate time reference and ensure it is within an acceptable tolerance.

5. Interval Data Verification:

- Allow the meter to collect interval data for a period of time (e.g., 15 minutes).
- Download the collected data from the meter using appropriate software or device.
- Examine the data to verify that the interval readings are reasonable and consistent with expected usage patterns.

6. Power Loss Test:

- Simulate a power loss by disconnecting the meter from power.
- Reconnect power and verify that the meter retains its time and data settings.

7. Calibration Check (Optional):

- If desired, calibrate the meter against a known voltage or current source to ensure its accuracy.
- Consult the manufacturer's instructions for specific calibration procedures.

Additional Tips:

- Keep a record of the verification process, including the date, time, and any observations made.
- Regularly monitor the meter's performance and compare the data with previous readings to detect any potential issues.
- Contact the manufacturer or a qualified technician for assistance if any problems are encountered during the verification process.