- All in and lump sum: "All in" refers to a pricing model where all costs associated with a project are included in the quoted price, while "lump sum" refers to a fixed price for a project that includes all costs, with no additional charges.

- Labour only and package deal: "Labour only" refers to a pricing model where the customer pays only for the labor involved in a project, while "package deal" refers to a pricing model where the customer pays a fixed price for a bundle of services or products.

- Target cost and design and build: "Target cost" refers to a pricing model where the customer sets a budget or target cost for a project, and the contractor works to meet that cost, while "design and build" refers to a project delivery method where the contractor is responsible for both the design and construction of a project.
0
G
Google Gemini AI
Jul 30
All In vs Lump Sum

- All In: The contractor is responsible for all aspects of the project, including design, materials, and labor. The client pays a single, lump sum fee for the entire project.
- Lump Sum: The contractor provides a fixed price for the complete project, but the client is not responsible for materials or labor. The contractor is responsible for managing the project within the agreed-upon price.

Labor Only vs Package Deal

- Labor Only: The client hires a contractor to provide only labor for the project. The client is responsible for sourcing and purchasing all materials.
- Package Deal: The contractor provides both labor and materials for the project. The client pays a single price for all aspects of the project.

Target Cost vs Design and Build

- Target Cost: A project delivery method where the target cost is set at the beginning of the project. The contractor works with the client to design and build the project within the target cost. If the actual cost exceeds the target cost, the contractor is responsible for absorbing the difference.
- Design and Build: A project delivery method where the contractor is responsible for both the design and construction of the project. The client has less control over the design process, but can benefit from the contractor's expertise and integrated project approach.